Archaeological work completed between 2004 and 2005 as part of a large scale construction of a subway infrastructure project in Battery Park and the adjacent area uncovered segments of the 18th-century defensive Battery, resources associated with Whitehall Slip, and ...
1439 - South Ferry - Excavation Unit 25 - Pollen and Phytolith Soil Samples
Pollen and Phytolith samples from Excavation Unit 25 column from between the logs. Samples were taken at 2 cm intervals from 2 to 104 cm below surface.